LESCO New Connection

Do you worry and don’t know how to apply for LESCO New Connection? Here is a step-by-step guide in this article, so stay tuned with us. We will make it easy for you to apply and submit of application for a Lesco new connection. The process is written in full detail for LESCO’s new connection.

LESCO Demond Notice Charges

The fee for a single phase Meter is Rs.10500 Rupees for demand notice for a Domestic connection. 

And three-phase connection price is about Rs.33,500 to Rs.235,000.

If you are a Lesco consumer, you can check the latest LESCO Duplicate Bill Online and estimate your Bill With LESCO Bill Calculator.

LESCO New Connection

Procedure to Apply New Lesco New Connection:

Step1. Visit the ENC Portal for Online submission of the Lesco New connection application.

Before going to the main part of an article and visiting the  ENC portal, take all the required documents.

  • You will need an image of the Property document. 
  • Attested CNIC copy of the applicant
  • Attested CNIC Copy of Witness
  • Neighbor’s bill Copy
  • Contractors Wiring test report

Now, Go To the ENC website and click on the above button.

  • You will need to submit the required information.
  • Click on the left sidebar to apply the new connection option.
  • Select your distribution company. We are going to choose Lesco.
  • Now, enter the neighbor’s 14-digit reference number. 
  • If you are applying for a home, select “Home” in the category and select a load up to 15 kW.
  • Now, enter your information on an application, such as your name, father’s name, present address, CNIC number, and mobile phone number (which are required).
  • It’s time to provide the premises details. For example, issues are already connected to your name with minimum load and premises address.

Now, you have filled out the application form. After filling out the form, you need to click on the “I agree box” and submit the application for Lesco’s new connection.

Now print your online application and enter your noted tracking ID to print it.

Now you need to Attach all documents mentioned above and submit a hard copy to the Lesco office.

After submitting online and physical applications, Wapda officials will ensure your address, document, and the possibility of a new connection. This procedure may take up to 30 days, so be calm.

Change Connection Name/Tariff/Load Process for LESCO consumers

Changing the connection name, load Process and Tariff is also simple, like a new connection. Just follow the below steps.

  • Visit the Official ENC site.
  • Click on the change option. 
  • Select the option that you want, like changing the connection name, tariff, and load type.
  • Now, enter the information as mentioned above.
  • If you are applying for a name change, fill in the old and new names in the “name box.”
  • If you are applying for tariff change, in the tariff box, change your tariff from the old one to the new one that you want.
  • If you selected the changing load, give them the new load requirements and tell them which load you have already installed.

Required Documents for change Name, Tariff, Load:

  • Attested CNIC Copy of Applicant
  • Bill Copy of Applicant
  • Property Document

Now, submit the application. They will assign you an application tracking ID number and note that ID number.

Now click on the application print option from the menu.

Select Lesco to enter your Tracking ID number, and print your submitted application copy.

Attach all the documents mentioned earlier and submit a hard copy to the Wapda office.

What is Demand notice?

Demand notice is the term used by Wapda. That means demand notice is the fee for your new connection that you have applied.

It has the mentioned price on it, and you are, as an applicant, required to pay in the bank that is mentioned on the demand notice against the request for a new electricity connection.

What is LESCO New Connection Fee?

According to LESCO, the fee for a single phase is Rs.10500 Rupees of demand notice for a Domestic connection. 

The three-phase connection price is about Rs.33,500 to Rs.235,000.

2 Comments

  1. MIAN IJAZ AHMAD says:

    AOA
    PLEASE LET ME KNOW THE CHARGES OF TERRIF CHANGING AND CHANGE OF NAME,

  2. Noor M Sheikh says:

    I want to change the load from 8kW to 11kW in one K house in DHA. Kindly let me know the additional amount to be paid for the demand note

Leave a Reply

Your email address will not be published. Required fields are marked *